logo

logo

Walking in step with the times, crowned by the passage of years.

Group News

Tender Notice – Specialized Subcontract for Fit-Out Works



2026-09-29

The renovation and fit-out works for the Binhu Chengshi Tiandi and Huiyuan public rental housing projects, undertaken by our organization, are now ready to proceed with the fine‑finish construction phase. We hereby invite qualified domestic bidders to participate in the tender for specialized subcontracting services for this project.

The project undertaken by our organization Renovation and refurbishment of the Binhu City Tiandi and Huiyuan public rental housing projects Now equipped with Fine-decoration project Construction conditions: We are now inviting bids for the specialized subcontracting works of this project. Qualified bidders are welcome. of the Domestic The bidder shall participate in the bidding.

1. Project Overview

(1) This project is located at Baohe District, Hefei City 。

(2) Project Scale: The City World project is located on the south side of Wanquanhe Road in the Binhu New Area. This renovation project involves a total of 1,063 residential units, distributed across two buildings—A and B—with a renovated gross floor area of approximately 53,500 square meters. Binhu Huiyuan is situated at the intersection of Zhongshan Road and Yulong Road in the Binhu New Area, encompassing 14 residential units with a total floor area of about 530 square meters.

2. Scope of Tender and Contracting Method

(1) Scope of the tender: This includes, but is not limited to, Urban World (five unit types totaling 1,063 units), Huiyuan (Type A, 2710, 14 units), and the maintenance and renovation of common areas at Urban World. The scope of work encompasses, but is not limited to, fit-out, soft furnishings, furniture, and home appliances (including the first-floor lobby, storefront signage, and the fourth-floor service reception desk). Unless otherwise specified, all items within the scope of the design drawings shall be accounted for as shown in the plans.

(2) Lot Division and Work Quantity Allocation

This project is divided into three contract packages, with each package initially allocated 100 sets of works. The specific scope of work for each package will be determined by the Employer in accordance with the overall project schedule. During construction, the Employer may adjust the quantities of work upward or downward based on factors such as the progress, quality, safety, civilized construction practices, and level of cooperation demonstrated by each successful bidder. The base contract price and the settlement discount rate are identical across all winning bidders; any differences arise solely from the allocation of work quantities.

(3) Contracting Method:

This project is executed on a turnkey basis, including both labor and materials. ( But Tenderer Except for the materials provided by the responsible party. Tenderer The scope of materials to be provided is detailed in the attachment. 《 List of Materials Supplied by Party A for the Renovation and Reconstruction Project of Binhu City Tiandi and Huiyuan Public Rental Housing Projects 》 ; except as listed in the attachment Tenderer With the exception of the materials provided, all other materials are prepared by… Bidder Responsible for providing ) , The scope of work encompasses turnkey project management, quality assurance, safety compliance, finished‑product protection, civilized construction practices, and comprehensive testing—including self‑inspection, random sampling, third‑party inspection, material submission for testing, and associated testing fees—along with meticulous cleaning, internal material handling to designated locations, post‑completion site cleanup, and the preparation of all required as‑built documentation and settlement materials. 。

(4) Construction Period: 120 days , Specifically, the soft and hard fit-out works for Building A, along with any necessary rectification and cleaning, shall be completed and handed over by December 15, 2026 (this deadline is non‑negotiable). For Building B, the soft and hard fit-out works, together with rectification and cleaning, shall be completed and handed over by January 13, 2027. In addition, construction work in certain occupied rooms must be finished within 90 days after handover.

(5) Project Quality: In accordance with the quality-related provisions of the general contract and in compliance with current national standards, Finishing construction and acceptance criteria; the project quality complies with…   Qualified   Standard.

3. Qualification Requirements

(1) A specialized construction enterprise with experience in similar projects, a strong track record, and an excellent reputation, possessing the financial resources, machinery, and equipment necessary to complete the assigned work, and duly staffing an organizational structure and personnel commensurate with the project’s scale. Bidders must have Independent legal person status, business license Grade III specialized contracting for construction and interior decoration works, or Grade III general contracting for construction projects. Qualifications of this level and above , Safety Production License, Bank Account Opening License, Similar Project Performance ( At least two similar projects within the past five years. ) and other materials.

(2) Possessing adequate performance capability; the amount of the performance bond is specified in the tender documents.

(3) At each project site, the bidder shall assign at least the following management personnel: one Project Manager, one Full-time Safety Officer, and one Construction Supervisor. 。 The aforementioned personnel shall be stationed on-site at all times and subject to the Employer’s attendance monitoring, accounting for no less than 80% of the monthly working hours.

(4) Bidders must have a sufficient number of professionally skilled personnel, who must be certified and qualified to perform their duties.

(5) This tender will adopt a post-qualification review process. Bidders who fail to meet the eligibility requirements and are therefore not selected as the successful bidder shall bear full responsibility for such failure.

4. Registration and Acquisition of Tender Documents

(1) Registration Period: From the date of publication of the tender notice until… 2026  year   10  month   7   day Previously, from 8:30 a.m. to 5:30 p.m. daily. (Regular contact during holidays) 。

When registering, please bring photocopies of your company’s business license, qualification certificates, safety production license, and relevant performance records, all stamped with the official seal, along with a letter of authorization to complete the registration process.

(2) File Acquisition: Engineering Management Center of Anhui Xinjian Holding Group Co., Ltd., 27th Floor, Huifeng Building, No. 665 Huangshan Road, Hefei City – Tender Document Acquisition ( Bring your own USB drive to receive the electronic file. ) or Contact the tenderer by phone to deliver the electronic version of the documents. 。

(3) Registration Fee and Document Acquisition Fee : 0 yuan 。

(4) Bid Security: No charge.

5. Site Inspection: The bidder shall make its own arrangements at its own expense.

6. Bid Opening Time and Venue

(1) Bid opening time: 2026  year   10   month   8   day 10:00 a.m. (Beijing Time) 。

(2) Bid opening location: Anhui Xinjian Holding Group Co., Ltd., 27th Floor, Huifeng Building, No. 665 Huangshan Road, Hefei City.

7. Contact Information

Tenderer: Anhui Xinjian Holding Group Co., Ltd.

Address: 27th Floor, Huifeng Building, No. 665 Huangshan Road, Shushan District, Hefei City

Bidding Contact: Manager Yao Contact Number: 17775345587

On-site Contact: Manager Li Contact number: 18255180320