Anqing S332 Underpass Railway Box Culvert Jacking Project
Anqing S332 Underpass Railway Box Culvert Jacking Project
+
  • Anqing S332 Underpass Railway Box Culvert Jacking Project
  • Anqing S332 Underpass Railway Box Culvert Jacking Project

Anqing S332 Underpass Railway Box Culvert Jacking Project

This project is located in Anqing City and passes beneath the Anzhi Railway Line. The construction period is 90 days, and the structural system is a reinforced concrete frame. The structural dimensions are 9.5 + 12 + 12 + 12 + 12 + 9.5 m, with a clear height of 8.4 m.

This project is located in Anqing City and passes beneath the Anzhi Railway Line. The construction period is 90 days, and the structural system is a reinforced concrete frame. The structural dimensions are 9.5 + 12 + 12 + 12 + 12 + 9.5 m, with a clear height of 8.4 m.

Keyword: Anqing S332 Underpass Railway Box Culvert Jacking Project