Underpass Box Culvert Jacking Project on Silihe Road
Underpass Box Culvert Jacking Project on Silihe Road
+
  • Underpass Box Culvert Jacking Project on Silihe Road
  • Underpass Box Culvert Jacking Project on Silihe Road

Underpass Box Culvert Jacking Project on Silihe Road

This project is located in Silihe, Hefei City, and passes underneath the Hejiu, Hewu, Ningxi, and Shiba Kilometer railway sidings. The construction period is 120 days. The structural system is a reinforced concrete frame, with dimensions of 8.5 + 12.5 + 12.5 + 8.5 m and a clear height of 9.6 m.

  This project is located in Silihe, Hefei City, and passes beneath the Hejiu, Hewu, Ningxi, and Shiba Liang Railway Dedicated Lines. The construction period is 120 days. The structural system is a reinforced concrete frame, with dimensions of 8.5 + 12.5 + 12.5 + 8.5 m and a clear height of 9.6 m.

Keyword: Underpass Box Culvert Jacking Project on Silihe Road