-
Group ProfileQuality forges excellence, innovation achieves the future
-
Business DomainWe build the era and lay the foundation for it
-
NewsWe cherish the years, and are in turn cherished by them.
Honors and Qualifications
National Level 10
National Level 08
Improving the first‑pass pile‑setting pass rate of steel sheet piles in complex geological conditions.
National Level 09
Green Construction Method for Bored Piles in Loess Terrain
Construction Method for Installation and Alignment Control of Steel–Concrete Composite Sections in Wide-Deck Composite Girder Cable-Stayed Bridges
Improve the first‑time pass rate of cast-in-place pile construction quality.
Standardized Construction Method for Tunnel Secondary Lining Reinforcement
Increase the first‑time pass rate for the installation and acceptance of stormwater and sewage pipelines.
Standardized Construction Method for Prefabricated Pier Columns in Prefabricated Bridge Construction
A street lamp base
Construction Method for Non-Stop Water Supply Connection of Branch Pipes
A reinforced inspection well
Semi-automatic Post-Anchored Jacking and Sliding Construction Method
A bridge pavement structure
A type of river-crossing pipeline structure
Contact Us
Add: 27F, Huifeng Building, No. 665, Mount Huangshan Road, Hefei, Anhui
Phone:15955101362
Email:1612902258@qq.com
Copyright © 2026 Anhui Xinjian Holding Group All Rights Reserved.
-
-
Telephone
-
Scan and sweep
WeChat QR code
Follow us

