Honors and Qualifications

National Level 10

National Level 10

National Level 08

National Level 08

Improving the first‑pass pile‑setting pass rate of steel sheet piles in complex geological conditions.

Improving the first‑pass pile‑setting pass rate of steel sheet piles in complex geological conditions.

National Level 09

National Level 09

Green Construction Method for Bored Piles in Loess Terrain

Green Construction Method for Bored Piles in Loess Terrain

Construction Method for Installation and Alignment Control of Steel–Concrete Composite Sections in Wide-Deck Composite Girder Cable-Stayed Bridges

Construction Method for Installation and Alignment Control of Steel–Concrete Composite Sections in Wide-Deck Composite Girder Cable-Stayed Bridges

Improve the first‑time pass rate of cast-in-place pile construction quality.

Improve the first‑time pass rate of cast-in-place pile construction quality.

Standardized Construction Method for Tunnel Secondary Lining Reinforcement

Standardized Construction Method for Tunnel Secondary Lining Reinforcement

Increase the first‑time pass rate for the installation and acceptance of stormwater and sewage pipelines.

Increase the first‑time pass rate for the installation and acceptance of stormwater and sewage pipelines.

Standardized Construction Method for Prefabricated Pier Columns in Prefabricated Bridge Construction

Standardized Construction Method for Prefabricated Pier Columns in Prefabricated Bridge Construction

A street lamp base

A street lamp base

Construction Method for Non-Stop Water Supply Connection of Branch Pipes

Construction Method for Non-Stop Water Supply Connection of Branch Pipes

A reinforced inspection well

A reinforced inspection well

Semi-automatic Post-Anchored Jacking and Sliding Construction Method

Semi-automatic Post-Anchored Jacking and Sliding Construction Method

A bridge pavement structure

A bridge pavement structure

A type of river-crossing pipeline structure

A type of river-crossing pipeline structure